Page MenuHomeAleph Objects Inc

shipping position > calibration
Open, Needs TriagePublic

Description

Suggested by @DaniAO on T6329 to move shipping position step to calibration OHAI instead of packaging
https://ohai.lulzbot.com/project/calibration-taz-pro/quiver/

Related Objects

Event Timeline

logan created this task.Mon, Apr 22, 7:20 AM
logan created this object with edit policy "LulzBot Hardware Products (Project)".
logan added a comment.Mon, Apr 22, 7:40 AM

@DaniAO Looking at this a bit closer, it looks like that was put in packaging because one cannot reach both Idler Tube Clamp fasteners in order to remove the feed tubes if the Z axis is at home (shipping position).
Perhaps we'll need to supply packaging with a power cord at that station so that once the feed tubes are removed they can plug in, turn the unit on, and the turn it off once it reaches the top.
Alternatively, we could remove the feed tubes at calibration, have them placed on the bed with the cables/paperwork/test print, and have them home the z axis.
Which would you prefer?

@logan what ever would be easiest, and keep the line moving in the most consistent and timely matter.

@logan Talking with Levi in packaging, we thought it would be easiest for all of us to make sure the screws for the tube clamps were loosened before sending to be packed, that way they don't have to worry about trying to move the X Axis. This is what we've been doing for the Betas that have been packed so far. Maybe just add that step to the calibration OHAI?

DaniAO assigned this task to EricNugent.Tue, May 7, 10:12 AM
DaniAO added a subscriber: EricNugent.

@paulette sounds like a good idea to me.

@EricNugent please update OHAI to reflect these notes.

Thanks.