First article inspection notes from the manufacturer:

QC: Please include any notes on the initial first inspection.
Purchasing: Once QC has approved initial inspections, please alert supplier of current status.

Event Timeline

oliver created this task.May 17 2019, 11:45 AM

Inspection results:

05/17/19

Inspection report has been completed and is ready for review.

oliver added a comment.EditedMay 17 2019, 12:04 PM

Inspection notes:

  • Weld was not done to spec and there is a visible gap.
  • As noted on the report, inserts were not used for the bottom two and was instead threaded into the aluminium. (Item #57)
  • It is not on the spec sheet but I heard that we did not want them using a ink company identifier which they did use
  • The shelfs were slightly lower but only required a small adjustment to bring them into spec

kent moved this task from Restricted Project Column to Restricted Project Column on the Restricted Project board.May 29 2019, 12:01 PM
kent claimed this task.May 31 2019, 8:28 AM
kent triaged this task as Normal priority.
kent changed the edit policy from "All Users" to "Restricted Project (Project)".
kent moved this task from Restricted Project Column to Restricted Project Column on the Restricted Project board.Jun 5 2019, 8:51 AM
kent moved this task from Restricted Project Column to Restricted Project Column on the Restricted Project board.Jun 6 2019, 10:17 AM

I was looking through the report that we already have generated in the old format and noticed that a lot of the tolerances from the title block were mis-interpreted so this FA was done to looser tolerances than the design requires. I'm going to go through and create an inspection form in the new format and with the tolerances specified in the design.

kent moved this task from Restricted Project Column to Restricted Project Column on the Restricted Project board.Jun 6 2019, 12:41 PM

kent added a comment.Jun 6 2019, 12:59 PM

Here is the final report. They failed on a few inserts and on the weld.

kent moved this task from Restricted Project Column to Restricted Project Column on the Restricted Project board.Jun 6 2019, 1:07 PM
kent removed kent as the assignee of this task.Jun 7 2019, 7:58 AM
kent added a subscriber: kent.
AOJAS added a subscriber: AOJAS.Wed, Sep 18, 3:41 PM

All 10 units received back from PMM with inserts corrected. The weld gap issue not correctable without remaking the parts, so they appear to have left the weld area unaltered.
The weld gap is a result of their process, and callout on the type of weld is a cosmetic callout that doesn't affect function, so Kent and I are not inclined to pursue that issue further with the supplier unless AO decides to order production quantities with them, at which time we should discuss with Product Planning whether or not an exception can be granted. In the past we granted an exception to Rapid Sheet Metal on the weld gap callout, and their Mini bottom plates worked quite well.