Page MenuHomeAleph Objects Inc

Bridge Nylon - Taulman
Open, Needs TriagePublic

Description

Material Name: Bridge Nylon
Material Type: Nylon 6 6,6 6T
Manufacturer: Taulman
SDS Link: http://devel.alephobjects.com/lulzbot/filament/taulman/SDS's/msds_taulman_nylon_bridge.pdf
http://devel.alephobjects.com/lulzbot/filament/taulman/Bridge/SDS/SDS_Nylon%20645-B%20Bridge.pdf
REPORT Link: UNAVAILABLE

Material Basic Info

  • Print Temp Range: 250C - 265C
  • Bed Temp Range: 45C
  • Speeds: 30mm/s - 35mm/s
  • Fan/Cooling: OFF
  • Retraction: 3 - 4mm
  • Layer Height Range: --

Drying Info:
120F for 24 hours

NOTES: http://taulman3d.com/bridge-nylon.html

Machine – Tool head = Profile Status
(in order of priority)

  • (1) TAZ Workhorse Edition – HE(0.5) =
  • (2) TAZ Workhorse Edition – HS(0.8) =
  • (3) TAZ Workhorse Edition – SL(0.25) =
  • (4) TAZ Workhorse Edition – DualV3 =
  • (5) TAZ Workhorse Edition – HS+(1.2) =
  • (1) TazPro – Dual(0.5) =
  • (2) TazPro – HS(0.8) =
  • (3) TazPro – SL(0.25) =
  • (4) TazPro – AeroV2 – SE(0.5) =
  • (5) TazPro – HS+(1.2) =
  • (1) Mini2 – AeroV2 – SE(0.5) =
  • (2) Mini2 – HS(0.8) =
  • (3) Mini2 – SL(0.25) =
  • (4) Mini2 – HS+(1.2) =
  • (1) Taz6 – HS(0.8) =
  • (2) Taz6 – SL(0.25) =
  • (3) Taz6 – AeroV2 – SE(0.5) =
  • (4) Taz6 – HS+(1.2) =
  • (5) Taz6 – DualV3 =
  • Mini1 – AeroV2 – SE(0.5) =
  • Mini1 – SL(0.5) =
  • Mini1 – HS(0.5) =
  • Mini1 – HS+(0.5) =

STATUS NOTES:

**Cold Pull Instructions:

Event Timeline

anolen created this task.Thu, Aug 1, 1:25 PM
anolen updated the task description. (Show Details)Thu, Aug 1, 4:06 PM
anolen updated the task description. (Show Details)Thu, Aug 1, 4:13 PM
anolen updated the task description. (Show Details)
hanna updated the task description. (Show Details)Fri, Aug 2, 3:10 PM
hanna updated the task description. (Show Details)Fri, Aug 2, 3:33 PM
anolen added a comment.Tue, Aug 6, 9:28 AM

Feedback for Taz Workhorse Edition: T8876

anolen added a comment.Tue, Aug 6, 9:50 AM

Feedback for Taz Pro Dual: T8855

anolen added a comment.Tue, Aug 6, 9:53 AM

Older Ticket for Dual V3 Toolhead profile development:
T4867