Page MenuHomeAleph Objects Inc

PP-MP0281: lead nut screws need to be threaded
Open, HighPublic

Description

The drawing does not call out that the screws need to be threaded.

Event Timeline

oliver created this task.Aug 6 2019, 1:37 PM
oliver triaged this task as High priority.
oliver created this object with edit policy "LulzBot Hardware Products (Project)".
tutley added a comment.Aug 7 2019, 7:29 AM

The original part did not have the lead nut mounting screw holes tapped, it was assembled with some longer screws and M3 nuts. This allowed a bit of adjustment in case of binding. I then changed the part to have m3 tapped holes on the 5 prototypes and never had a binding issue, but I never updated the drawing to reflect this change. This drawing was sent out to JMT so that is why the alpha/beta parts will not have these holes tapped.
So, the alpha/beta units will have thru holes with the lead nut mounted using 2mm longer hardware and M3 nuts (with loctite). This will function just fine but for production units we should have the tapped holes in the carriage.

i have updated and revved the drawing to reflect this with R231:61c011656b6d

JMT did these for us for alpha and beta, but did we get these set up for FA from any one else?

@tutley

we got a quote for these from igus T9479