bowman added a comment to T6814: Up date to the Taz Pro Quality Assurance Record.

@kent you can save some time and not create a "print shop" version since we will be print them in house.

Tue, May 21, 4:27 PM · Quiver

Tue, May 14

bowman added a comment to T7263: Need a process to help calibration with things such as wire crimps and similar issues.

We will continue to improve quality processes in the goal to not have any units that need "fixing" at the calibration station.
(It will always be an on-going process of effort to constantly improve our productivity, but we are all going to work towards the goal to not have any "fixes")

Tue, May 14, 6:26 PM · Restricted Project
bowman added a comment to T7263: Need a process to help calibration with things such as wire crimps and similar issues.

We will have some tools over here that we can address and correct the small "quick fix" issues, ie bad crimp or wired pulled out, blown fuse etc.
Large problems like replacing a boards and lcd's. whole box failures and such, it will be faster just to swap the control box with another one and then red tag the defective one and send back for rework.
We should not have to stock many spare parts here.

Tue, May 14, 12:30 PM · Restricted Project

Thu, May 9

bowman added a comment to T7124: Taking too long to calibrate the printers.

@Steven @oliver @wolffchadd Can we get / make sure that the rest of the final people trained/certified to take this over from MER 100% That way we have plenty of people that can perform this function.

Thu, May 9, 3:47 PM · Quiver

Wed, Apr 24

bowman added a comment to T6712: Redgum Final Concept Review.

Approved

Wed, Apr 24, 3:52 PM · Redgum

Apr 23 2019

bowman added a comment to T6771: Where will Quiver USB sticks be copied.

We will want to keep as we used to do and do this in calibration. Kent is setting it up now.

Apr 23 2019, 10:36 AM · Quiver

Apr 15 2019

bowman added a comment to T6644: Increase in the number of issues seen on LCD Screens.

@adam it was at s/n KT-PR0041NA-31341 when we started.

Apr 15 2019, 1:01 PM · Redgum, Mini-Hibiscus

Apr 10 2019

bowman added a comment to T6568: Serial number labels created .

@DaniAO I have the folder setup started and will get with you this morning to work on completing it and pushing to devel

Apr 10 2019, 7:27 AM · Quiver

Apr 9 2019

bowman added a comment to T6563: We need a master log to record finished calibrated printers..

@kent we also need to have the fields to track if/when a printer that is already calibrated and then gets pulled for secondary inspection by MER. (ie when training new cal techs)
Can use the same layout as the Mini log and then add the new fields that MER and R&R want to track.

Apr 9 2019, 11:58 AM · Quiver
bowman added a comment to T6439: Process change request for Caution Hot stickers on interface board cover.

@DaniAO @logan Yes, lets go ahead and do this if it saves time and makes it more effective. Thanks,

Apr 9 2019, 11:30 AM · Quiver

Apr 2 2019

bowman added a comment to T5820: Need drawing for AS-HE0040.

Drawing delivered to production

Apr 2 2019, 2:40 PM · TAZ 6

Mar 26 2019

bowman added a comment to T5820: Need drawing for AS-HE0040.

We can probably close this ticket. We now have the new Hot-ends from E3D and are using them. We no longer need to use the Gunnison (FS) extruder.
@EricNugent is working on a new drawing for AS-HE0041's that are now being used.

Mar 26 2019, 3:49 PM · TAZ 6

Mar 14 2019

bowman added a comment to T5820: Need drawing for AS-HE0040.

Also, please change the name/description for AS-HE0040 as these are used on the (FS) TAZ 6 tool head and not on a v3 dual

Mar 14 2019, 9:16 AM · TAZ 6
bowman added a comment to T5981: AS-PR0143&142 title change/missing insert.

No problem with changing the name/description.

Mar 14 2019, 8:53 AM · Quiver

Mar 5 2019

bowman added a comment to T4337: Warehouse Stock Monitoring (Tool Head Disc).

The last production MO for KT-CP0094 is completed. Josh P has set to not procure both KT-CP0094/KT-CP0095 v2c tool heads any further.

Mar 5 2019, 8:14 AM · Retail Parts

Mar 4 2019

bowman added a comment to T5875: beta production issues .

@logan These were all done by MER. Lets go through all of them to make sure they are done correctly and that the Ohai is updated and correct. Thanks!

Mar 4 2019, 7:14 AM · Quiver

Feb 26 2019

bowman added a comment to T5882: Process change for extruder cap installation.

Sounds fine. Now is a good time to change the BoM since we are waiting for the chassis to procure/build the next 5 Final assemblies.

NOTE: We will have to track down the calibration MO that Mike R. had in his possession to have it cancelled and re-procured when the BoM is changed.
Feb 26 2019, 1:06 PM · Quiver

Feb 25 2019

bowman added a comment to T4837: Serial Number Labels.

@DaniAO Lets go ahead and start with 1001

Feb 25 2019, 11:55 AM · Quiver

Feb 13 2019

bowman added a comment to T5659: PP-IS0098 - Correct HD-MS0060 to HD-MS0158.

@DaniAO OCA shows that these were completed and produced on 2/8
For some reason, the BoM did not get corrected to change the HD-MS0060 to HD-MS0158's before it got produced in OCA.
Mike and I verified that the drawing was correct and that the correct inserts HD-MS0158's were used.
Just need to update the BoM to use the correct insert number.
Since the MO got produced in oca before the bom got change and a new mo procured, Inventory Control will have to
make an adjustment to the inserts (neg adjust hd-ms0060 qty -160 and then pos adjust hd-ms0158 qty +160

Feb 13 2019, 10:01 AM · Quiver

Feb 7 2019

bowman added a comment to T5627: ecostrip blades excessive wear with solid core wire.

@logan, using the 9300 sound great. Lets go ahead and pull out and set it up to use for solid core only. Lets put a sign on it stating to use for solid core ONLY.
After talking with @guadalupe , she is going to set up a spot on top of the bench (same bench you mentioned) to place the cutter and then it can be pulled forward to use and then slid back when not in use.
Since we only use the one solid core wire, we can schedule production so that it will only require wires to be cut a couple times a month.

Feb 7 2019, 1:35 PM · Restricted Project
bowman added a comment to T5492: Make taz 6 frame squaring fixture using taz 7 type design..

@logan Yes, we will use the same top. I will actually order 3 more so that we can make a new TAZ 6 jig and then extra for both a TAZ6 and TAZ Pro backup's.
I have not ordered this yet, but it is included in the floor plan/expansion costing sheet I am preparing for Grant.

Feb 7 2019, 12:54 PM · Restricted Project

Jan 30 2019

bowman added a comment to T5492: Make taz 6 frame squaring fixture using taz 7 type design..

Sounds Good! I will add a couple of extra table tops to the equipment list. Like you said, setting up just the table tops will take up much less room for storing and then we can just swap out using the same workbench.

Jan 30 2019, 8:37 AM · Restricted Project
bowman added a comment to T5492: Make taz 6 frame squaring fixture using taz 7 type design..

@logan @kent for now, I think we will only need to purchase 1 more table to set up for TAZ6 frames. I will take care of ordering that bench by putting it with the equipment needed for re-tool of production.
@kent Do you think we will need to have an extra table set up for hot swap? Maybe we will be fine just having an extra set of the hardware available on hand. We can get another table/board pretty quickly and
build another setup if we ever need to replace one.

Jan 30 2019, 8:13 AM · Restricted Project

Dec 4 2018

bowman reassigned T3043: LCD bracket installation sometimes destroys printed mount from tomc to wolffchadd.

Worked on this issue with @kent and it was determined that we could fix with a re-design, however, since the product is released, we can look into it more for a later rev if needed.
In the mean time, we can correct most of the problems by making sure that the parts are aligned properly during installation at final assembly. We have had several new people learning mini final assembly recently.
Re-assigning this ticket to @wolffchadd to work with Kent/MER and provide training to all final assembly personnel. As well as make sure that the Ohai instruction set documents this.

Dec 4 2018, 1:34 PM · Mini-Hibiscus

Nov 20 2018

bowman closed T4238: Dingy Initial Production MR as Resolved.

Both Banded and dingy are in full production

Nov 20 2018, 8:26 AM · Dingy Cutworm(1.2mm)
bowman closed T4219: Banded Initial Production MR as Resolved.

Both Banded and dingy are in full production

Nov 20 2018, 8:26 AM · Banded Tiger
bowman closed T3774: Build production units for both adapters as Resolved.

Both adapters are in full production

Nov 20 2018, 8:25 AM · Retail Parts

Nov 13 2018

bowman added a comment to T4219: Banded Initial Production MR.

5 ea of both Banded and Dingy have been completed for initial build to verify routing/BoM's. Now ramping up production on both.

Nov 13 2018, 7:41 AM · Banded Tiger
bowman added a comment to T4238: Dingy Initial Production MR.

5 ea of both Banded and Dingy have been completed for initial build to verify routing/BoM's. Now ramping up production on both.

Nov 13 2018, 7:41 AM · Dingy Cutworm(1.2mm)

Nov 8 2018

bowman added a comment to T4219: Banded Initial Production MR.

@adam The oahi (up to boxing part) is completed and the tool heads (5 each Banded/Dingy) are built and in process of finalizing the boxing Ohai.
The route for the cut scotch brite pads is being completed and then we can get them cut for boxing.
The route for the printed double wiper mounts was not setup. Jessica completed route and issued MO to have them print 500. As soon as we have a small quantity printed today,
we will send them to pre-sub to have to complete the boxing.

Nov 8 2018, 10:35 AM · Banded Tiger
bowman added a comment to T4238: Dingy Initial Production MR.

@adam The oahi (up to boxing part) is completed and the tool heads (5 each Banded/Dingy) are built and in process of finalizing the boxing Ohai.
The route for the cut scotch brite pads is being completed and then we can get them cut for boxing.
The route for the printed double wiper mounts was not setup. Jessica completed route and issued MO to have them print 500. As soon as we have a small quantity printed today,
we will send them to pre-sub to have to complete the boxing.

Nov 8 2018, 10:35 AM · Dingy Cutworm(1.2mm)

Nov 6 2018

bowman added a comment to T3774: Build production units for both adapters.

Started production on Mini adapters, KT-CP0141 Qty 60 completed

Nov 6 2018, 1:53 PM · Retail Parts

Oct 24 2018

bowman added a comment to T3774: Build production units for both adapters.

Started production on the TAZ 4/5 Adapters. KT-CP0140

Oct 24 2018, 1:54 PM · Retail Parts

Oct 15 2018

bowman added a comment to T3774: Build production units for both adapters.

We have not built any of these yet due to hold on Beta toolheads. @adam and I spoke about them and we feel that we are okay to start production.
Going to start them this week somehow. We now have a lot of RED buffer tool-heads that are in front of them.
Will also add the increase to the queue.

Oct 15 2018, 11:33 AM · Retail Parts

Oct 3 2018

bowman closed T3755: Build beta units for Dingy Cutworm as Resolved.

MER completed 1 unit for Ohai instructions/testing. 14 Units completed and delivered to Adam. All units have serial numbers and noted as beta's in the tool head log.

Oct 3 2018, 10:32 AM · Dingy Cutworm(1.2mm)
bowman closed T3754: Build beta units for Banded Tiger as Resolved.

MER completed 1 unit for Ohai instructions/testing. 14 Units completed and delivered to Adam. All units have serial numbers and noted as beta's in the tool head log.

Oct 3 2018, 10:31 AM · Banded Tiger

Sep 27 2018

bowman added a comment to T3235: PP-GP0335 Flexy Bed Corner : TAZ6 Flexy.

@EricNugent this looks like it should work good.

Sep 27 2018, 9:57 AM · Restricted Project
bowman added a comment to T3754: Build beta units for Banded Tiger.

We do have 30 PP-IS0069's already inserted and will use those for the 15ea beta's of both dingy/banded. @MichaelM will pull and red tag the remaining 20 pcs of PP-GP0344 from pre-sub

Sep 27 2018, 9:39 AM · Banded Tiger
bowman added a comment to T3755: Build beta units for Dingy Cutworm.

We do have 30 PP-IS0069's already inserted and will use those for the 15ea beta's of both dingy/banded. @MichaelM will pull and red tag the remaining 20 pcs of PP-GP0344 from pre-sub

Sep 27 2018, 9:39 AM · Dingy Cutworm(1.2mm)

Sep 26 2018

bowman added a comment to T3754: Build beta units for Banded Tiger.

Received replacement hardened gear hobbs PP-FP0154 and Inv.Control transferred to pre-sub.
AS-HE0028 hot ends transferred to Pilot, MO 54398 procured for crimping/building AS-HE0034's

Sep 26 2018, 2:12 PM · Banded Tiger
bowman added a comment to T3755: Build beta units for Dingy Cutworm.

Received replacement hardened gear hobbs PP-FP0154 and Inv.Control transferred to pre-sub.
AS-HE0029 hot ends transferred to Pilot, MO 54397 procured for crimping/building AS-HE0033's

Sep 26 2018, 2:12 PM · Dingy Cutworm(1.2mm)
bowman updated subscribers of T3774: Build production units for both adapters.

Mfg request for both KT-CP0140 and KT-CP0141 have been created. 100-Chicago, 20-Retail for both kits. - Release of these to production is on hold - pending beta tool-head/adapter testing approval.
(will release these to production once beta units for Macro/Moar aerostruder's are completed and testing is satisfactory)

Sep 26 2018, 10:29 AM · Retail Parts
bowman triaged T3774: Build production units for both adapters as Normal priority.
Sep 26 2018, 10:11 AM · Retail Parts
bowman closed T3341: Mount Adapter OCA Routing as Resolved.

All routes look good. Processed MO"s for Beta/Testing units KT-CP0140 qty 13 MO completed 9/14, KT-CP0141 Qty 15 MO completed 9/17. Transferred to Mktg/Delivered to @adam for testing distribution.
Closing routing ticket.

Sep 26 2018, 9:38 AM · Retail Parts

Sep 24 2018

bowman updated subscribers of T3755: Build beta units for Dingy Cutworm.

printed parts are completed from cluster, @MichaelM is procuring 15ea of PP-IS0069, PP-IS0074 to be inserted.
Hot-end AS-HE0033 will be procured and @guadalupe will get them crimped once the raw parts as-he0029 are transferred to Pilot.
All of the cables and other pilot assemblies are completed and ready. Once the inserted parts and hot end parts are completed, we will procure/produce the AS-TH0069 tool heads.
Once the labels for packaging arrive, we will finalize the Ohai for the completed boxing.

Sep 24 2018, 2:58 PM · Dingy Cutworm(1.2mm)
bowman updated subscribers of T3754: Build beta units for Banded Tiger.

printed parts are completed from cluster, @MichaelM is procuring 15ea of PP-IS0069, PP-IS0070 to be inserted.
Hot-end AS-HE0034 will be procured and @guadalupe will get them crimped once the raw parts as-he0028 are transferred to Pilot.
All of the cables and other pilot assemblies are completed and ready. Once the inserted parts and hot end parts are completed, we will procure/produce the AS-TH0070 tool heads.
Once the labels for packaging arrive, we will finalize the Ohai for the completed boxing.

Sep 24 2018, 2:57 PM · Banded Tiger

Sep 20 2018

bowman added a comment to T3694: Make TAZ 7 Control Box test stand.

@kent yes, we will want to test them in the same fashion

Sep 20 2018, 7:34 AM · Quiver

Sep 18 2018

bowman updated subscribers of T3626: One hole for nyloc nut is smaller than other in adjustable belt tensioner.

@EricNugent @kent @logan @tutley They are struggling with seating the nyloc nuts on both X and Y parts causing a high amount of frustration and is taking way more time than is desired.
Please work with @MichaelM and Christina Cashimer (as well as other insert people) to find the most proficient part design/assembly method.

Sep 18 2018, 10:29 AM · Mini-Hibiscus

Sep 4 2018

bowman updated subscribers of T3387: Mount Adapter Betas.

Eric is going to print 15 each and then give them to Inventory to adjust into pre-sub. Pilot is building 15 each of the adapter cables on MO's for pre-sub.
Once those are completed and in pre-sub, Pre-sub / MER @MichaelM, @kent will complete the ohai and get them to @adam

Sep 4 2018, 2:49 PM · Retail Parts

Aug 27 2018

bowman updated subscribers of T2985: Initial Warehouse Shipment - Mini 2 Replacement Hot End Kit.

It appears that we are waiting to complete the Ohai and final BoM. Will verify with @MichaelM

Aug 27 2018, 1:52 PM · Retail Parts

Aug 21 2018

bowman reopened T3387: Mount Adapter Betas as "Open".
Aug 21 2018, 2:12 PM · Retail Parts
bowman closed T3387: Mount Adapter Betas as Resolved.

@adam Yes, we will make the bandwidth to produce these Betas.
Transferring ticket to @caguilar Inventory control to set up routing and then we will procure MO's to produce the parts.
Then we can transfer parts to MER to complete the OHAI instructions and build completed beta adapter kits.

Aug 21 2018, 2:12 PM · Retail Parts

Aug 20 2018

bowman added a comment to T3378: Achemon Product Release.

Provided we receive the packaging materials to box them up, we should be good to go.
Right now we have everything except [DC-MS0073] Filament Warning Insert, 8.5" x 2", Astrobrite Lift Off Lemon and that should be here early this week.
We currently have 50 tool heads already built and waiting to be boxed.
We are building more this week and should have all of the initial request of 150 completed by mid-end of next week (8/31).

Aug 20 2018, 12:12 PM · Achemon Sphinx

Jul 30 2018

bowman added a comment to T3205: Quiver Packaging Redesign.

The main feedback from the line is to try to find a way to not have to remove the tool head from the printer and box it separately.

Jul 30 2018, 11:41 AM · Quiver
bowman added a comment to T3160: Alpha/Beta Achemon Builds.

@adam MO's are in process and being built. All 15 units should be done today/tomorrow

Jul 30 2018, 11:10 AM · Achemon Sphinx

Jul 27 2018

bowman added a comment to T3160: Alpha/Beta Achemon Builds.

@adam we should be good to go. I will get this setup in our production/labor tracking on Monday. And then confirm routing with @caguilar
And then I will get MO's procured and start building. As per our talk, since the packaging part is still pending, we will procure/produce the AS-TH0068 (qty 15) assembly and then transfer those to marketing.

Jul 27 2018, 2:10 PM · Achemon Sphinx

Jul 23 2018

bowman added a comment to T3016: Athena Program Approval (Phase Review 1).

I'm on board with moving forward as-is and answering questions here.

Jul 23 2018, 8:47 AM · Athena

Jul 2 2018

bowman updated subscribers of T3043: LCD bracket installation sometimes destroys printed mount.
Jul 2 2018, 9:31 AM · Mini-Hibiscus

Jun 18 2018

bowman added a comment to T2994: Some Machines found to have a short spool arm.

Tyler and Mike M checked all of the parts in production and purged any that were old. I checked the 50 that were in backstock and all were correct version.
It appears that there was an incorrect version for running these parts on a TAZ6 and somehow got mixed up. The TAZ 6 file has been removed so that cluster is not able to use it.

Jun 18 2018, 1:52 PM · Mini-Hibiscus

Jun 5 2018

bowman updated subscribers of T2556: X-idler bearings have a space in between them.
Jun 5 2018, 10:53 AM · Mini-Hibiscus

May 10 2018

bowman added a comment to T2164: QC and packing lists.

As long as MER approves both. They should be good to send to the print shop

May 10 2018, 8:54 AM · Mini-Hibiscus

May 2 2018

bowman created T2493: Change caution hot sticker placement to different assembly.
May 2 2018, 11:22 AM · Mini-Hibiscus

Apr 30 2018

bowman added a comment to T2418: Include UL final testing to CAL.

We won't have to test each power cord that is shipped with EU's/AU's.
However, we should test using the exact same power cord that is used for burn-in/calibration and shipped with the printer.

Apr 30 2018, 1:08 PM · Mini-Hibiscus

Apr 26 2018

bowman added a comment to T1799: Beta MBoM.

@logan I made a change on the one label below (dc-lb0156) the rest should be good where they are.

Apr 26 2018, 3:02 PM · Mini-Hibiscus

Mar 29 2018

bowman created T2253: fork terminal on AS-CB0069 Z brake power harness.